The duty is on the organisation, not the contractor
Under the Health and Safety at Work etc. Act and the Control of Legionella Bacteria in Water Systems Approved Code of Practice (ACOP L8), the duty holder must assess and control the risk of exposure to Legionella. In practice that means identifying a responsible person, ensuring a suitable and sufficient risk assessment is carried out, and putting in place a written scheme of control that describes what is done, how often and by whom.
Buying a contract does not transfer that duty. What a contractor provides is competent help: assessment, cleaning, monitoring, sampling and reporting. The organisation remains accountable for making sure it actually happens and that records exist.
The documents an inspector will ask for
A current risk assessment that reflects the building as it is now, not as it was five years ago. A written scheme of control. Monitoring records — temperatures, inspections, flushing, cleaning — with the frequency stated and met. Laboratory results. Remedial works with evidence of completion and verification. A schematic of the water system. Training and competence records for whoever carries out the work.
- Up-to-date risk assessment and system schematic
- Written scheme of control with defined frequencies
- Temperature monitoring and inspection records, complete and signed
- Sampling results with interpretation and action taken
- Cleaning, disinfection and remedial certificates
- Evidence of competence for staff and contractors
Where sites most often fall short
In our experience the gaps are consistent. Records stop when a member of staff leaves. Risk assessments are never reviewed after a refurbishment, a change of use, or a change in occupancy — all of which can materially change the risk. Little-used outlets are forgotten outside the monitoring round. Tanks are cleaned but post-clean samples are either not taken or not filed. TMV servicing is done without recorded outlet temperatures.
None of these are expensive to fix. They are all symptoms of a programme that has not been owned by anybody.
A reasonable annual cycle
Review the risk assessment and schematic. Confirm the monitoring schedule and who carries it out. Programme tank inspection and cleaning based on condition. Set sampling dates from the scheme. Service TMVs and record outlet temperatures. At year end, review results and trends and adjust the scheme if the building or its use has changed.
If you are inheriting a building or a contract with no records, start with a risk assessment and a condition survey of the tanks. Those two documents determine almost everything that follows.
This article is general guidance, not a site-specific risk assessment. Control measures for your building should follow your written scheme of control and the Approved Code of Practice L8 with HSG274.